In the March 2016 edition of the Wind Energy Network Magazine SCICON worldwide bvba has (co-)published an article about the potential (high) costs involved with offshore premature coating failure and/or repairs.
Illustrated by 3 real life case-studies that we have inspected or investigated in the last couple of years, we have presented very realistic examples of such coating problems together with the failure/repair costs that were involved (or could have been involved). This clearly illustrates that 'independent & specialized inspections' such as provided by SCICON worldwide bvba will very likely not even cost you money, but more likely SAVE you money in such projects.
Read more in the attached article by clicking on the link below the pictures.